More scaffolding has been set up and the bricking of the next level has really taken off. Weather permitting it should be finished next week. Much progress was achieved last week with roughly 70% of the brickwork done, even the brickwork for the outdoor shed was half done. Most of the windows were installed and two were bricked into place with sills. Below are a couple of progress photos.
This photo shows the new left side of the house, as the front door has now been moved to the corner street.
Above is the new garage and front entry of the house.
The last photo shows the view from the right side of the block (our backyard).