Two weeks later and the roofing is still in progress – 90 % complete with most of the internal wall frames up. I was invited on site however to reconfirm the placement of the skylights, which was great as we realised one of them was not going to look right so we ended up changing it to more of a square looking shape rather than rectangle. Whilst I was there we ran through a couple of other changes and corrections, all of which were detailed in an email for the builder to address. The second level bricks have been cleaned and they look fantastic.
The plan for the next 2 weeks is to finish the brickwork and then get the roof tiles up. We have finally booked in our site meeting for the 21st when everyone is available, now I need to get my list of discussion items up to date to be sure that we cover them off whilst we are onsite.
I must mention I’m pretty impressed with our builder’s attitude when fixes and issues are raised. Nothing is too hard and the cheap and easy way is never taken. If it isn’t right Rocco will acknowledge it and address it firsthand.
No comments:
Post a Comment