Thursday, 28 August 2014

Rough-in complete

We now have confirmed the air conditioning vent shapes and locations. All of the rough-in appears to now be complete, gas, air conditioning, vacuum points, electrical & plumbing. So hopefully the gyprock is next.

Below are some photos of what the current internals look like without walls:

This is the view from our dining area which is situated near the alfresco and is part of the lounge/kitchen open plan area (north side of the house).

Some serious Cat 6 data cables!

This is the southern side of the house with a view from our media room, into the laundry, main bathroom, bedroom 3, ensuite and then main bedroom.