All of the flooring is now complete as well as the remaining plasterboard that was required for the downstairs hallway. All of the arcs and skirtings have been installed plus the laundry door is in. The fireplace surround is done and waiting for the rest of the joinery.
This week the tilers are starting to lay both the inside and outside tiles so that the bathroom fittings can be installed next week.
I’ve lined up a couple of businesses to give quotes for internal wardrobes and blinds/shutters for the next 2 weeks with the hope that they can be installed mid December if the house is ready for us to move in, as I wasn’t really happy with the stock standard robes being provided by the builder.