So this is what has been going on since my last post – The floorboards have been laid in all of the upstairs rooms. The Quickslide wardrobe doors have been installed for all of the built ins. The internal doors, door frames and skirting boards have also been done. The alfresco deck has been done and it is level with the inside floorboards so that we have a seamless inside/outside dining area – yipee!
The shed door has been made and installed using the same Ekowood material as the eaves and decking.
No comments:
Post a Comment