I did a drive by and noticed that the front door
and sidelight had now been installed. I’m not too sure if I like the opaque
sidelight, I think I would have preferred clear glass, but this is something my
partner wanted so I let this one slide. The Chippys were inside working on
installing the floorboards and doors/architraves etc.
The tilers should be in next and then we’ll be on
the home stretch. The viewing of the internal robes at another site has been
delayed again as that home was having its floorboards polished so access was
limited. Hopefully we will get to see them this Friday so that we can finalise
that component.
No comments:
Post a Comment